Kia · 2025
EV4 Unplugged Ground Seongsu — Frame

- Role
- Led and developed all Frame LED content, infotainment table and mobile content
- Scale
- Project period: Jan 2025 – Mar 2025Permanent exhibit at Kia Unplugged Ground SeongsuLive webcam capture, background compositing and mobile deliveryReal-time mobile and lighting integrationOpened March 1, 2025
- Affiliation
- Worked on this as part of IM FINE.
Frame at Kia Unplugged Ground Seongsu is an LED experience that captures visitors through a live webcam and composites their images with a selected mood background. Visitors can receive the finished images on mobile.
We led and developed all Frame LED content. In Unreal Engine, we built the flow that sends captures to a server for background compositing and mobile delivery, linking mood selection, capture signals and lighting in real time. We also developed all Unity-based infotainment table and mobile content.
Result: Opened to the public as a permanent exhibit on March 1, 2025.